Project summary

40kWp Solar PV & Power Redirection

 As a working farm, the owner had already invested in a Ground Source Heat Pump for the main house with 14kWp of Solar PV serving the barn and adjacent office buildings. 

Our survey revealed that although heating costs had been reduced the solar power generated was not benefitting the GSHP and hence higher electricity usage had resulted.

Following DNO approval, we designed and installed an additional 40kWp PV System to the main barn roof and via the addition of a 180m buried cable, re-directed the solar electricity to the supply to the main house and office buildings. 

In addition to increased CO2 emission reductions and benefitting from the Feed in Tariff, a significant proportion of the 38,320kWh of solar electricity generated annually is now used to augment power the GSHP, office buildings and main house thereby minimising annual electricity consumption. 